No. | Tajuk | Tarikh | Sumber | File | |
---|---|---|---|---|---|
134 orang dipindahkan ke pusat pemindahan | 18/10/2016 | Utusan Malaysia | 18102016UTUSAN134orangdipindahkankepusatpemindahan007.pdf | ![]() | |
Fenomena air pasang dijangka lebih buruk | 18/10/2016 | Utusan Malaysia | 18102016UTUSANFenomenaairpasangdijangkalebihburuk004.pdf | ![]() | |
Jambatan rosak kerajaan negeri tidak beri perhatian | 18/10/2016 | Utusan Malaysia | 18102016UTUSANJambatanrosakkerajaannegeritidakberiperhatian006.pdf | ![]() | |
Penduduk diarah pindah benteng penahan air pecah | 18/10/2016 | Utusan Malaysia | 18102016UTUSANPendudukdiarahpindahbentengpenahanairpecah005.pdf | ![]() | |
Sawah air masin | 19/10/2016 | Metro | 19102016HmetroSawahairmasin021.pdf | ![]() | |
Enam tan bebola lumpur bantu pulih Sungai Nyior | 19/10/2016 | Kosmo | 19102016KOSMOEnamtanbebolalumpurbantupulihSungaiNyior022.pdf | ![]() | |
Air melimpah dibeberapa lokasi | 19/10/2016 | Sinar Harian | 19102016SinarHarianAirmelimpahdibeberapalokasi026.pdf | ![]() | |
Ban jalan Kebun baru pecah | 19/10/2016 | Sinar Harian | 19102016SinarHarianBanjalanKebunbarupecah028.pdf | ![]() | |
JPS perlu RM20 juta | 19/10/2016 | Sinar Harian | 19102016SinarHarianJPSperluRM20juta023.pdf | ![]() | |
Baiki Benteng Keselamatan | 14/10/2016 | Metro | 14102016HMetroBaikiBentengKeselamatan006.pdf | ![]() | |
RM3juta baiki sistem perparitan | 14/10/2016 | Metro | 14102016HMetroRM3jutabaikisistemperparitan005.pdf | ![]() | |
11 000 guni pasir sebagai benteng | 14/10/2016 | Sinar Harian | 14102016SinarHarian11000gunipasirsebagaibenteng007.pdf | ![]() | |
Paras tertinggi air dijangka Isnin ini | 14/10/2016 | Sinar Harian | 14102016SinarHarianParastertinggiairdijangkaIsninini009.pdf | ![]() | |
Perlu belajar daripada kesilapan | 14/10/2016 | Sinar Harian | 14102016SinarHarianPerlubelajardaripadakesilapan008.pdf | ![]() | |
RM3mil to tackle high tides | 14/10/2016 | Star | 14102016STARRM3miltotacklehightides010.pdf | ![]() | |
Strengthening flood defences | 14/10/2016 | Star | 14102016STARStrengtheningflooddefences011.pdf | ![]() | |
Living amid the filth | 13/10/2016 | Star | 13102016STARLivingamidthefilth002.jpg | ![]() | |
Plans to upgrade drains and deepen retention pond next year | 13/10/2016 | Star | 13102016STARPlanstoupgradedrainsanddeepenretentionpondnextyear003.pdf | ![]() | |
Masalah saliran tahap kritikal | 13/10/2016 | Berita Harian | 13102016BHarianMasalahsalirantahapkritikal006.pdf | ![]() | |
Tak sanggup hadapi banjir | 13/10/2016 | Berita Harian | 13102016BHarianTaksangguphadapibanjir007.pdf | ![]() | |
Bomba siap siaga | 13/10/2016 | Metro | 13102016HmetroBombasiapsiaga004.pdf | ![]() | |
Lokasi diramal banjir di Selangor | 13/10/2016 | Metro | 13102016HmetroLokasidiramalbanjirdiselangor005.pdf | ![]() | |
Having a heart for rivers | 13/10/2016 | Star | 13102016STARHavingaheartforrivers003.pdf | ![]() | |
Sand bag put up to stem high tides | 13/10/2016 | Star | 13102016STARSandbagputuptostemhightides002.pdf | ![]() | |
Fenomena air pasang besar penduduk pelabuhan Klang perlu sedia berpindah | 11/10/2016 | Utusan Malaysia | 11102016UtusanFenomenaairpasangbesarpendudukpelabuhanKlangperlusediaberpindah002.pdf | ![]() |