w3c
Reset Setting Change font size to lower sizeChange font size to original sizeChange font size to large size
    T
    T
    T
    T
    T
    T
Dam1-edited.jpg
dam21.jpg
Design_1.jpg
Design_2.jpg
Design_3.jpg
Design_4.jpg
Official Portal for
Department of Irrigation and Drainage
Ministry of Energy Transition and Water Transformation
Most View

Mobile Application

> Page 1



 

Client Charter Achievement of the Department of Irrigation and Drainage (Until end of April 2023)

No.

Obligation JPS

Compliance To Time Frame/Client Charter Standard

Non-Compliance To Time Frame/Client Charter Standard

Total Number Of Service Given
(Bulanan)

Numbers Of Compliance To Standard

Percentage Of Compliance To Standard

Numbers Of Non-Compliance To Standard

Percentage On Non-Compliance To Standard

1.

Provide initial feedback on any public complaints and enquiries through Sistem Pengurusan Aduan Awam (SISPAA) regarding water resources issues such as floods, river, coastal and drainage within two (2) working days and to provide feedback on method of solutions within fifteen (15) working days.

1804 99.7% 6 0.30%

 

           1810

 

2.

Provide forecasts and warning dissemination for monsoon flood in 6 hours lead time via PublicInfobanjir website for rivers with flood forecast model.

39 100% 0 0% 39

3.

Provide technical review for complete application of EIA, land development and reclamation for residential, industrial, commercial and agricultural sectors within one (1) month.

 

 

 

 

 

 

a. BPB   100% 0 0%  
b. BPLS 38 93% 3 7% 41
c. BPZP 12 100% 0 0 12
d. BPSAH 81 100% 0 0% 81
e. BSMA 9 100% 0 0% 9

4.

Supply the followings information within seven (7) working days

         

 

a. Hydrological Data 285 100% 0 0%

285

 

b. Hazard Map/ Flood Map          

 

c. River Basins Data 0 0 0 0 0

 

d. GIS Data 1016 100% 0 0% 1016

 

e. Coastal Zone Data 0 0 0 0 0

5.

Ensure viability of access to JPS portal at 95%.

100.00 100% 0 0% 100.00


Last Updated 2023-06-16 09:34:28 by

  •  
  • Email this page