Primary objective of SMART: To alleviate flooding problem at the Kuala Lumpur city centre due to stormwater from the Klang-Ampang catchment. Added benefit of SMART: To ease traffic congestion at the southern main gateway (TUDM at Sungai Besi) to the city centre. |
||
SMART Operation The tunnel begins at Kg. Berembang where the Diversion Weir at the confluence of Sg. Klang/ Sg. Ampang and Offtake Structure divert flood water to the Holding Pond. The water then flows through the Intake Bell Mouth structure into the Tunnel and discharge at the Attenuation Pond at Taman Desa flood water is stored in this pond before releasing to Sg. Kerayong through the Twin Box Culvert. |
||
![]() |
||
![]() |
SMART Control Centre is in operation 24 hours a day. Once high flow is measured at the confluence, the SMART Control Centre will send a signal to the Motorway Control Centre to evacuate the traffic from the tunnel. After ensuring the road tunnel is cleared, the traffic compartment will be flooded. Once the flood has receded, the tunnel will be cleaned and opened to the public. |
Operational Modes of The Smart Tunnel. |
![]() |
Last Updated 2016-12-15 15:22:24 by Administrator