Sembrong Dam was completed in 1984 and formed part of the Western Johore Integrated Agricultural Development Project in the State of Johor. It is located about 10km from Air Hitam town in the state of Johor on the Air Hitam - Kluang road. The dam was primarily for flood mitigation but the stored water (up to RL8.5m) is tapped by Syarikat Air Johor for water supply. Currently, they are abstracting approximately 2Mld directly from the dam for domestic water demand. |
Background of Project |
|||
Location |
Year Completed |
Year of Contruction |
Project Cost |
Batu Pahat, Johor |
1984 |
1981 |
RM 24,000,000.00 |
Information of Strtucture |
|||
Reservoir Area |
Capacity |
Catchment Area |
Height |
8.5 Km² |
18 Mm³ |
130.0 Km² |
11.0 m |
Crest Length |
Structure Material |
Crest Elevation |
Jenis Spillway |
1770.0 m |
Earthfill |
15.0 m |
Concrete Fixed Ungated Ogee Crest |