Reset Setting Change font size to lower sizeChange font size to original sizeChange font size to large size
    T
    T
    T
    T
    T
    T
Dam1-edited.jpg
dam21.jpg
Design_1.jpg
Design_2.jpg
Design_3.jpg
Design_4.jpg
Official Portal for
Department of Irrigation and Drainage
Ministry of Environment and Water
Most View

Mobile Application

Basic Dam Information



Basic Dam Information

 

Name of Dam  
(Year Completed)/Size (L=Large, S=Small)
Location (State) DAM RESERVOIR Hazard Classifi-cation Purpose Construction Cost (RM)
Type Height (m) Crest Length
(m)
Crest Elevation
(m)
Catch-ment
Area
(sq.km)
Capacity 
(Mcm)
Max.Spillway Discharge (cumecs) Surface Area
(sq.km)
Elevation
(NPL in m)
1 Timah Tasoh(1992)/L Perlis Earth 17.30(L) 3455(L) 32.0 191 40.0(L) 436 13.33 29.1 High I/W/F 24,521,655.60
2 Padang Saga(1964)/S Kedah Earth 8.3 61 23.01 12 0.2 195 0.05 21.18 Significant I/W/F 243,285.95
3 Bukit Kwong(1964)/L Kelantan Earth 7.62 1524(L) 18.29 11 14.3(L) 42.5 4.04 16.76 High I/W NA
4 Bukit Merah(1906)/L Perak Earth 9.1 579.09(L) 11.28 480 74.98(L) 424.7 41.0 8.69 High I/W 1.6 juta
5 Gopeng (1961)/S Perak Earth 8.54 85.34 70.71 10.6 0 78 NA NA Low Sr NA
6a Old Repas(1925)/S Pahang Earth 13.4(L) 210 143.29 10 0 60 NA NA Low Sr NA
6b New Repas(1963)/L Pahang Earth 20.0(L) 40 128.96 11 0.4 85 0.05 126.22 Significant Sr NA
7 Batu (1987)/L Selangor Earth 44.0(L) 550(L) 109.0 50 36.6(L) 228 2.50 102.7 High W/F 19.7 juta
8 Pontian (1985)/L Pahang Earth 15.5(L) 350 7.5 170 40.0(L) 605 20.00 5.00 Significant I/W 15,835,664.92
9 Anak Endau(1985)/L Pahang Earth 18.0(L) 700(L) 23.0 36 38.0(L) 250 7.20 19.00 High I/W 9,873,663.50
10 Labong (1949)/L Johor Earth 10.67 259 10.67 16 12.8(L) 84.5 6.05 8.03 Significant I/W NA
11 Bekok (1990)/L Johor Earth 20.3(L) 3460(L) 23.00 326 32.0(L) 1152 12.00 13.30 High W/F 22.0 juta
12 Sembrong(1984)/L Johor Earth 11.0(L) 1770(L) 15.0 130 18.0(L) 640 8.50 8.50 High W/F 24.0 juta
13 Macap (1982)/L Johor Earth 11.5(L) 550 19.81 77 30.6 306 9.09 15.85 Significant W/F 15.6  juta
14 Perting (2003) Pahang Porous 21.5(L) 138.6 118.0 125 NA 28.3 1.05 NA High Sr NA
15 Beris (2004)/L Kedah CFR 41.0(L) 150 89.0 116 102.4(L) 155 16.0 85.00 High I/W/F 

184.442 jut

LEGEND L/NL - Large/Not Large
NPL - Normal Pool Level
Mcm - 1 x 106 m3
F - Flood Mitigation
W - Water Supply
I - Irrigation
Sr – Silt Retention NA – Not Available
CFR – Concrete-faced  Rockfill

 

 

 




Last Updated 2017-01-09 10:46:25 by Administrator

  •  
  • Email this page