JPS Logo

Perting Dam

Attention: open in a new window. PDFPrintE-mail

perting dam.jpg

Background of Project
Location Year Completed Year of Construction Project Cost
Bentong, Pahang 2003 1999 Not Available

Information of Strtucture
Reservoir Area Capacity Catcment Area Height
1.05 Km² Not Available 125 Km² 21.50 m
Crest Length Structure Material Crest Elevation SpillwayType
138.6 m Porous 118.0 m Mass concrete flat crested overflow weir




myGovernment NRE MSC PEMUDAH PCB 1Malaysia